# Checkpoint 250 — BE-154 project report drafts and independent review

## Delivery

React now supports project status and RFI report drafts from records the signed-in user can access in Odoo. The BFF obtains the source snapshot from the authenticated Odoo session; the browser cannot provide source facts. The configured local Qwen model receives the selected records and a constrained JSON schema whose citation values are enumerated from the permitted project/task/RFI IDs. Strict Pydantic validation and exact source-membership checks run before persistence.

The Odoo bridge rechecks project/company permissions and the immutable source revision before saving a pending `be.ai.suggestion`. A different PM or Owner can review with a required rationale. Approval records an auditable review only; no report is applied, published or sent, and project/RFI records remain unchanged.

## Verification evidence

- Focused backend tests: **9 passed**, 172 deselected; 7 subtests passed.
- Native Odoo report lifecycle/security tests: **3 passed, 0 failures/errors**.
- Authenticated live React → BFF → Qwen 3.8 27B → Odoo browser journey: **1 passed** on a disposable clone. The PM generated the RFI report and an independent Owner approved its review.
- Postconditions verified the report author, reviewer, company, exact `project:307` / `rfi:94` citations, RFI remaining `open`, no applied timestamp and unchanged project write date.
- The QA clone was dropped and Build Engine Odoo restarted. Source database `be_qa_demo_full_20261025` was unchanged.
- Screenshots: [draft](frontend/screenshots/live-project-rfi-report-draft.png), [review](frontend/screenshots/live-project-rfi-report-review.png), [approved review](frontend/screenshots/live-project-rfi-report-approved.png).
- Machine-readable evidence: [PROJECT_REPORT_LIVE_QA.json](PROJECT_REPORT_LIVE_QA.json).

## Story classification and remaining work

BE-154 moved from MISSING to PARTIAL. Broader ordinary-role/company acceptance, business review/export policy, Arabic report evaluation and full A1–A4 acceptance remain open. This is not a claim that all story criteria are complete.

Totals: **17 DONE, 113 PARTIAL, 24 MISSING, 10 BLOCKED** out of 164. The DONE share remains **10.4%**; PARTIAL is a classification share, not a completion percentage.