# Checkpoint 278 — BE-128 approved proposal + BOQ archive pack (2026-10-27)

## Delivered

- Added an immutable Odoo project archive pack pairing an independently approved CRM technical-proposal archive with a readable confirmed/closed BOQ baseline for the same project and active company.
- Added a native QWeb BOQ baseline PDF containing the immutable snapshot lines, approved amount, company/project, and baseline confirmation actor/time. During Odoo tests, report generation now forces the actual PDF path instead of Odoo's normal test-mode HTML fallback.
- Odoo stores private copies of both PDFs, SHA-256 checksums, rationale, archiving actor/time, project/company and source references. Exact source-pair retry returns the existing pack; changed rationale is rejected. Pack records reject writes and deletion.
- Added authenticated BFF options/list/create/proposal-PDF/BOQ-PDF routes with strict request validation and the existing safe private-PDF response checks.
- React Project > Proposal archive now lists eligible independently approved proposal PDFs and confirmed BOQ baselines, requires a rationale, displays saved packs and provides separate PDF downloads. Existing proposal-only archive listing remains available even where the user cannot manage packs.
- Bumped `namaa_ai_bridge` to `20.0.1.0.30`.

## Verification

- Isolated Odoo 20 focused proposal archive lifecycle/security suite: **12 tests reported, 0 failures/errors**. It exercised the actual QWeb PDF generation path, private attachment/checksum readback, role denial, retry, download and immutability. Database: `be_qa_20261026_233124_824e`.
- Backend BFF contract/routes: **4 passed**, with 4 contract subtests.
- React units: **85/85 passed**; focused synthetic project archive browser journey: **1/1 passed**; Vite production build passed.
- Python compilation and `git diff --check` passed.
- Fresh isolated all-custom-module Odoo 20 run: **382 passed, 0 failures/errors** on `be_qa_20261026_233654_08d7`. The final archive retry/locking refinement was applied afterward and the affected focused proposal suite passed **12/12** again on that isolated database.
- Shared `namaa_ksa` was not changed.

## Story status and remaining work

BE-128 is **PARTIAL**, not DONE. Live authenticated React → BFF → Odoo acceptance for this feature, broader project/company/role boundaries, Arabic PDF visual review and the full React-first A1–A4 acceptance matrix remain open. No external publication or email is performed.

Traceability now classifies all 164 stories as **18 DONE, 123 PARTIAL, 13 MISSING, 10 BLOCKED**. The 75.0% PARTIAL share is a classification, not an overall completion score. See [traceability](../REQUIREMENTS_TRACEABILITY.md), [QA JSON](PROJECT_PROPOSAL_BOQ_ARCHIVE_QA.json) and [architecture](../ARCHITECTURE.md).