# Checkpoint 400 — BE-151 project risk acceptance DONE (2026-11-01)

BE-151 now meets its supplied A1–A4 criteria on the current source. The permission-checked Odoo bridge persists a source-cited schedule, cost and quality risk draft; React provides review and reopening; and company/project boundaries are checked before returning any report-list data.

## Acceptance evidence

- **A1 — Authorized persistence:** authenticated Project Manager generated a risk draft from current Odoo tasks, RFI, BOQ and nonconformance sources. Odoo persisted one pending `be.ai.suggestion`; the independent Owner review and assigned risk follow-up were also persisted.
- **A2 — Invalid input/no partial write:** malformed generation input and invalid assignment rationale returned field-level HTTP 422. Before/after report and audit state remained unchanged for invalid requests.
- **A3 — Reopened state and audit:** the fresh React Owner session reopened the approved report and displayed its project/company, author and timestamp. Odoo readback verified source citations, reviewer, risk-owner actor/time/company/project, and the linked project activity.
- **A4 — Permission and tenant boundaries:** same-company read-only access and foreign-company Owner/PM access to the target company's report list and risk-owner operations were denied without sensitive disclosure. Foreign users could read their own project's report endpoint; returned rows were constrained to that project and company.
- **Native verification:** focused current-source Odoo report bridge suite passed **7/7**.
- **Live verification:** authenticated React → BFF → Qwen 3.8 27B → Odoo journeys passed **2/2**, covering BE-151 risk review and the BE-157 lessons regression. BE-155 risk-owner assignment remained passing.
- **Cleanup:** disposable clone `be_project_report_live_2f06b973`, temporary BFF and QA Odoo process were removed. Source `namaa_ksa` was unchanged; source Odoo stayed healthy; frontend dependency symlink was restored.

BE-151 moves from PARTIAL to DONE. BE-155 and BE-157 remain DONE. Totals are **66 DONE (40.2%), 86 PARTIAL, 2 MISSING, 10 BLOCKED / 164**. No deployment was performed.

Evidence: [combined isolated live QA](PROJECT_REPORTS_LIVE_QA.json), [native and role/company tests](../../addons/namaa_ai_bridge/tests/test_project_reports.py), [live browser assertions](../../frontend/e2e/project-risk.live.spec.js), and [traceability row](../REQUIREMENTS_TRACEABILITY.md).