  "checked_at": "2026-11-03T14:27:12.439851+00:00",
  "stories": [
    "BE-055",
    "BE-056",
    "BE-153"
  ],
  "result": "passed",
  "source_database": "be_qa_20261026_154521_105e",
  "qa_database": "be_qa_variation_impact_aaac0996",
  "qa_clone_dropped": true,
  "odoo_restarted_after_qa": true,
  "native_tests": "4 passed, 0 failures/errors",
  "live_browser": "1 passed",
  "postconditions": {
    "database": "be_qa_variation_impact_aaac0996",
    "suggestion_ids": [
      19,
      21
    ],
    "variation_id": 13,
    "suggestion_states": [
      "pending",
      "pending"
    ],
    "suggestion_creator": "variation.pm",
    "company_id": 1,
    "model": "qwen3.8:27b",
    "languages": [
      "en",
      "ar"
    ],
    "source_ids": [
      "boq_line:82",
      "contract:24",
      "contract_key_date:6",
      "project_task:540",
      "variation:13",
      "variation_line:14"
    ],
    "english_summary": "Variation VO/00013 (variation:13) proposes a +10-unit modification to BOQ line 82 'HVAC ducting' (boq_line:82) at a unit cost of 75.0, yielding a total amount delta of 750.0 (variation_line:14). The stated reason is a client request for additional HVAC ducting in a new service corridor (variation_line:14). The variation is in draft state (variation:13) and has not been approved. The 750.0 delta is within the contract's remaining variation allowance of 1500.0 and the 20% ceiling on the 7500.0 contract value (contract:24). The associated task 'Install HVAC ducting' (project_task:540) is in 'New' stage with zero planned and zero effective hours, a deadline of 2026-11-15, and sits 15 days before the critical 'Mechanical completion' milestone of 2026-11-30 (contract_key_date:6). No duration, labor, or resource impact of the additional 10 units is quantified in the source records.",
    "arabic_summary": "تغيير رقم VO/00013 (حالة: مسودة) يتعلق بتعديل سطر BOQ رقم 82 الخاص بـ«توصيلات تكييف الهواء (HVAC ducting)» بزيادة كمية قدرها 10 وحدات بسعر وحدة 75.0، بإجمالي فرق 750.0. السبب المسجّل: طلب العميل إضافة توصيلات تكييف لممر خدمة جديد. العقد CTR/00024 بمبلغ إجمالي 7500.0 وسقف تغييرات 20% مع رصيد متبقٍ 1500.0. المهمة المرتبطة (تثبيت توصيلات HVAC) في مرحلة «جديد» بحد أقصى 2026-11-15، بينما تاريخ الإنجاز الميكانيكي الحرج 2026-11-30. لا توجد ساعات مخططة أو فعلية مسجّلة للمهمة. هذا تقييم استشاري مبدئي فقط ولا يُعدّ موافقة أو تعديلاً على Odoo.",
    "arabic_uncertainty": "الأثر الزمني غير مُكمَّم لعدم وجود مدة تنفيذ أو معدل إنتاجية أو بيانات توريد في المصادر. الأثر التكلفة محصور في فرق 750.0 المسجّل (variation:13, variation_line:14) ولا تشمل تكاليف غير مسجّلة (عمالة، نقل، إشراف). التغيير في حالة مسودة (variation:13) وقد يتغير المبلغ أو الكمية قبل الاعتماد. لا توجد معلومات عن تداخل هذا العمل مع مهام أخرى أو عن متطلبات اعتماد مسبقة. جميع التقييمات هنا استشارية مبدئية ولا تُنشئ أي التزام.",
    "variation_state": "approved",
    "variation_creator": "variation.pm",
    "variation_updater": "variation.owner",
    "variation_amount": 750.0,
    "review_action": "approve",
    "reviewed_by": "variation.owner",
    "reviewed_at": "2026-11-03 14:27:00",
    "review_rationale": "Reviewed the scope, cost evidence and client change request.",
    "rejection_state": "rejected",
    "rejection_reviewer": "variation.owner",
    "rejection_rationale": "Rejected after reviewing the submitted evidence and scope.",
    "react_created_variation_id": 15,
    "react_created_state": "draft",
    "react_created_by": "variation.pm",
    "react_created_company_id": 1,
    "react_created_project_id": 202,
    "react_created_delta": 225.0,
    "react_created_ai_state": "pending",
    "react_created_ai_sources": [
      "boq_line:82",
      "contract:24",
      "contract_key_date:6",
      "project_task:540",
      "variation:15",
      "variation_line:16"
    ],
    "boq_quantity": 110.0,
    "baseline_id": 76,
    "baseline_count": 3
  },
  "screenshots": [
    "frontend/screenshots/live-variation-impact-draft.png",
    "frontend/screenshots/live-variation-impact-arabic-draft.png",
    "frontend/screenshots/live-variation-created-advisory.png"
  ],
  "source_database_modified": false,
  "limitations": [
    "The isolated journey uses one synthetic project/company, a PM, a same-company read-only user, a foreign-company PM and an independent Owner.",
    "BE-056 Owner authority follows the scoped DEC-06 provisional policy: independent Build Engine Owner review, requester self-review denied.",
    "The new variation was created in React and persisted in Odoo; its advisory draft is tied to the then-current source snapshot. Later approvals may make any pending advisory stale and it must be regenerated before use.",
    "The AI impact draft remains advisory; it cannot approve, reject or apply the variation."
  ],
  "failure": null,
  "story_results": {
    "BE-055": "passed: React-created change order reopened in Odoo with expected draft state, actor, company/project, BOQ line and calculated SAR amount; its source-cited advisory stayed pending and did not approve/apply the change.",
    "BE-056": "passed: requester self-approval and short rationale were denied without state change; independent Owner approved and rejected separate requests; Odoo readback verified immutable reviewer/time/rationale and BOQ baseline behavior."
  }
}